CGA Publications Index

By Category

select

By Subcategory

select

OR

By Title


By ID

OR

By Keyword


Keyword: cryogenics
IDEd.PublishedTitle 
Data pager
Data pager
1
 22 items in 1 pages
G-5.5 4 14 Apr 2021 Standard for Hydrogen Vent Systems
H-3 4 23 May 2024 Standard for Cryogenic Hydrogen Storage (an American National Standard)
P-30 5 22 Nov 2024 Guideline for Portable Cryogenic Liquid Containers—Use, Care, and Disposal
P-31 4 02 Feb 2021 Liquid Oxygen, Nitrogen, and Argon Cryogenic Tanker Loading Systems
P-35 2 16 Jul 2021 Guideline for Unloading Tankers of Cryogenic Oxygen, Nitrogen, and Argon
P-40 4 06 Sep 2017 Calculation Method for the Analysis and Prevention of Overpressure During Refilling of Cryogenic Tanks with Rupture Disk(s)
P-41 3 09 Aug 2023 Standard for Locating Bulk Liquid Storage Systems in Courts
P-48 2 01 Oct 2021 Reciprocating Cryogenic Pumps and Pump Installations for Oxygen, Argon, and Nitrogen
P-56 3 21 Nov 2022 Cryogenic Vaporization Systems—Prevention of Brittle Fracture of Equipment and Piping
P-59 3 10 Oct 2023 Prevention of Excessive Pressure During Filling of Cryogenic Vessels
P-69 1 16 Apr 2018 Guideline for Emergency Response to Cryogenic Liquid Releases
P-75 2 10 Oct 2023 Standard for Proper Handling of Insulated Tanks That are in Obvious Signs of Loss of Vacuum
P-8 7 23 Sep 2022 Guideline for Safe Practices for Cryogenic Air Separation Plants
P-8.3 5 16 Jun 2021 Perlite Management
P-8.6 3 29 Apr 2022 Unmanned Air Gas Plants—Design and Operation
P-8.7 1 18 Nov 2016 Safe Location of Oxygen and Inert Gas Vents
P-8.8 3 16 Jun 2021 Safe Design and Operation of Cryogenic Enclosures
P-85 1 13 Oct 2020 Guideline for Use of CGA-341 and TC-341 Cryogenic Trailers in the United States and Canada
P-93 1 28 Sep 2023 Guideline for Piping Failure Rates in Nontoxic Cryogenic Gas Supply Systems
PS-56 1 26 Sep 2018 CGA Position Statement on Internal Inspection of Stationary Vacuum-Jacketed Storage Tanks for Cryogenic and Refrigerated Liquids
PS-72 1 04 Apr 2024 CGA Position Statement on Inspection Requirements of Air Separation Unit Coldbox Internal Components
TR-7 1 28 Sep 2023 Methodology to Determine Piping Failure Rates for Nontoxic Cryogenic Industrial Gas Supply Systems With Pipe Size Up to 6 Inches